Not all utilities can be located with standard equipment. This case study shows a communication tower with cameras and speakers where the cables couldn’t be traced due to open-ended, unpowered lines and no termination access — a real example of why clear communication and Critical Zone planning are essential before excavation.
Aug 9, 20253 min read
Industry insights, guidelines, and real-world lessons from the field